All advice
Structure
Reviewed 22 September 2026Structural steels in alterations
Why beams need calculations, bearings, temporary works and inspection.
This is general information, not a survey, design, legal or Building Control decision. The correct scope and standard depend on the property, work, date and regulatory route.
Removing a wall or opening a loft can transfer loads into beams, posts, walls and foundations. A structural engineer should specify the member, bearings, connections, padstones and any strengthening.
Temporary propping and the installation sequence matter as much as the final beam. A builder should not select a steel size from a span alone or rely on a generic online table.