Full House Refurbishment Checklist: Plan Your London Renovation

Use this practical checklist to define the scope, permissions, specification and quotation for a full London house refurbishment.

A full house refurbishment can involve many connected decisions, from layout and structural work to services, finishes and temporary accommodation. A clear scope and sequence help homeowners compare quotations and understand what must be agreed before work starts.

## 1. Define the Existing Condition and Proposed Scope

Record the rooms, elements and services included in the project. Identify known defects, proposed layout changes, structural work and items that will remain. Surveys or specialist advice may be needed where the existing condition is uncertain.

## 2. Confirm Permissions and Professional Requirements

Planning permission may apply to extensions, external alterations, listed buildings or properties affected by local restrictions. Building Regulations can apply to structural, electrical, plumbing, insulation and fire-safety work. Party wall procedures may also be relevant. Confirm the requirements for the individual property and proposal.

## 3. Agree the Design and Specification

Set out drawings, room layouts, products, finishes, fixtures and performance requirements clearly enough for contractors to price the same work. Identify client-supplied items and any decisions that remain outstanding.

## 4. Review Services and Structural Work

Consider heating, plumbing, drainage, ventilation, electrical work and any structural alterations as part of the coordinated scope. Opening-up work can reveal hidden conditions, so the quotation and contract should explain how unforeseen additional work will be assessed and agreed.

## 5. Compare Detailed Quotations

Compare the agreed scope, specification, assumptions, exclusions, payment stages and proposed programme rather than relying on headline figures. Ask for current insurance documents, relevant recent references, examples of comparable work and a written scope of works. A detailed, transparent quotation should state the agreed pricing basis and explain how client-requested variations or unforeseen additional work will be handled.

## 6. Plan Access, Protection and Temporary Accommodation

Agree working hours, access, storage, protection of retained areas and waste arrangements. For extensive work, consider whether living in the property will be practical and safe during each stage.

## 7. Control Variations and Decisions

Keep decisions and client-requested changes in writing. Confirm their effect on scope, quotation and programme before the additional work proceeds.

## Get a Project-Specific Quotation

D-Core Construction Ltd prepares a **project-specific quotation after reviewing the property, proposed work and specification**. This provides current guidance for the individual refurbishment rather than relying on dated general price ranges or percentage allowances.