Back to Future Homes
Eco & Energy
How It Works
Manufacturer Guides
guidance
Reviewed: 22 September 2026

Airtightness and MVHR

Why air leakage, controlled ventilation, filters and commissioning belong in one design conversation.

Practical Points

  • 1.

    Define the airtight layer and protect it at windows, services and junctions.

  • 2.

    Size and route ventilation for rooms, access, noise and filter replacement.

  • 3.

    Require commissioning records and explain controls to occupants.

Considerations & Trade-offs

  • Duct routes and service zones consume space and need coordination.

  • Filters and fans need ongoing access, cleaning and maintenance.

Concept Scenarios

CONCEPT CASE STUDY — NOT A D-CORE PROJECT

Semi-detached loft concept

A discussion framework for roof-space accommodation while coordinating structure, fire, insulation, glazing and ventilation.

Options Included:

  • Dormer with coordinated warm-roof build-up
  • Roof-window-led layout
  • Phased fabric and services plan
CONCEPT CASE STUDY — NOT A D-CORE PROJECT

Passive retrofit concept

A staged retrofit thought experiment starting with diagnosis and envelope continuity, then ventilation and heating decisions.

Options Included:

  • Survey and repair first
  • Airtightness and ventilation package
  • Fabric works sequenced with heat-pump readiness

Content angles / Explore further

  • • YouTube: trace an MVHR route from intake to filter access without promising a comfort result.
  • • WhatsApp: ask where the airtight layer is marked around each service.
  • • LinkedIn: discuss commissioning records and occupant handover as part of the system.