Back to Future Homes
Eco & Energy
New Products & Materials
Manufacturer Guides
guidance
Reviewed: 22 September 2026

Insulation and external wall insulation

Why substrate, moisture, junctions, fire, fixings and finish must be assessed as a compatible system.

Practical Points

  • 1.

    Survey wall construction, exposure, damp, openings, eaves, plinths and services.

  • 2.

    Use one system's current details for fixings, reinforcement, reveals and render.

  • 3.

    Sequence water repairs and rainwater goods before closing the envelope.

Considerations & Trade-offs

  • EWI changes reveals, boundaries, eaves and external appearance.

  • Scaffolding, detailing and moving services add disruption and cost.

Concept Scenarios

CONCEPT CASE STUDY — NOT A D-CORE PROJECT

External wall insulation upgrade concept

A concept for improving an external envelope while testing moisture, junctions, rainwater goods, openings and finish compatibility.

Options Included:

  • System EWI with revised reveals and sills
  • Targeted insulation at constrained elevations
  • Whole-envelope sequence with roof and services

Content angles / Explore further

  • • Pinterest: compare reveal, sill, eaves and rainwater details around an EWI build-up.
  • • Nextdoor: share the moisture and substrate questions to ask before external insulation.
  • • YouTube: show why a render finish is not, by itself, an EWI system.